Public Higher Education Bulletin

 
Governors State University
Bid #D8152TMS

Invitation for Construction Bid: MCC, electrical distribution & BAS upgrades

This solicitation will not be awarded
Published Thursday January 24, 2008
 
This bid has been canceled and will not be awarded.

A new bid number will be issued with modified specifications no later than February 1, 2008.
This notice has been modified
Published Friday November 16, 2007
 
GSU requires the awarded, prime contracting firm to be pre-qualified with the State of Illinois Capital Development Board (CDB).
First published Wednesday November 14, 2007
Project Description
This work includes, but is not limited to the following: the addition of two new electrical buildings to provide new electrical distribution as defined; provide buried utility tunnels between the new buildings and the existing; upgrade the existing Siemens Building Automation System (BAS) by selected field controller modifications and connecting the BAS to the campus ethernet; addition of Transient Voltage Surge Suppression (TVSS) equipment to selected electrical panels in the main building; removal of existing emergency diesel generator (EDG) and addition of a new outdoor EDG.
Sealed bids will be accepted at the address below until 2:00 PM, Thursday December 20, 2007:
Purchasing Department
One University Parkway
University Park, IL 60466
Complete specifications, drawings and potential alternates will be posted to this web page for download by the end of business on November 16, 2007.
Mandatory pre-bid meeting:

The university will hold a mandatory pre-bid meeting the morning of November 29, 2007. Representatives will be present to answer questions. Prospective bidders must register in advance by calling Lisa at 708-534-4056. Bids submitted by bidders not in attendance at the mandatory conference will not be accepted.
If an additional meeting is required to accommodate tours and access to the facility, GSU and the engineer may schedule an additional mandatory meeting. This will be addressed in an amendment, if applicable.
GSU requires the awarded, prime contracting firm to be pre-qualified with the State of Illinois Capital Development Board (CDB). Firms are required to listed on the CDB web page as a pre-qualified contractor on the bid due date.
All responses must include:
  • Submit 4 copies of the response as defined in the specifications.
  • Sealed envelopes containing the bids have the bid number and project title on the envelope.
  • Bid security (see complete bid for details).

Bulletin Navigation

 
To obtain documents, log on:
Other Public Documents
  • D8152TMS.pdf (466 KB)
  • D8152TMSAmendment1.pdf (25 KB)
  • D8152TMSAmendment2.pdf (1 MB)
  • D8152TMSAmendment3.pdf (30 KB)
  • D8152TMSAmendment3b.pdf (83 KB)
  • D8152TMSAmendment4.pdf (405 KB)
  • D8152TMSAmendment5.pdf (385 KB)
  • D8152TMSAmendment6.pdf (29 KB)
  • D8152TMSAnnounce.pdf (6 KB)
  • D8152TMSdrawings.pdf (43 MB)
  • D8152TMSmanual.pdf (9 MB)