Request for Professional Services Qualifications (QBS): East Campus Residence Hall Rehabilitation Project
Amendment
Published Tuesday October 14, 2008
Consultant: Bozoian Group Architects, St. Louis, MO
Amendment amount: $98,410.80

The increase is a result of additional requirements identified during the construction phase of the project.
The University award process may be delayed up to thirty days as this award goes through a state approval process.
Award InfoPublished Thursday May 25, 2006
Awarded to:
Consultant: Bozoian Group Architects, St. Louis, MO
Amount: $1,590,145
Terms:
May, 2006 to August, 2009. This term includes the on-site construction observation portion of the agreement. The construction project is expected to be completed in August 2009. There are no options to renew.
Renewals:
None
Number of Unsuccessful, Responsive Respondents: 20
The University award process may be delayed up to thirty days as this award goes through a state approval process.
First published Wednesday, February 22, 2006
Project Description
Illinois State University is seeking statements of qualifications from architectural and engineering firms interested in providing planning and design services for improvements to the East Campus Residence Hall Complex, which consists of Manchester Hall, Hewett Hall, and Vrooman dining center. This project will be completed in two phases (one residence hall and dining center, then second residence hall) and will primarily consist of the reconfiguration of the sleeping floors, improvements to the restrooms on each sleeping floor, along with some cosmetic improvements to the entire complex. Vrooman dining center will be taken off-line as a dining center and will instead become the entrance to the complex, with activity spaces (classrooms, conference rooms, office spaces, exercise rooms, etc.) within. The total budget for the project is approximately $25,000,000.
Letter Submission
Qualifications and supporting materials will be accepted at the address below until 2:00 PM, Friday March 17, 2006:

Purchasing Office
117 Hovey Hall
Normal, IL 61790-1220

Your statement of qualifications must include the information included on the CDB 255 form and any other information about your firm that you would like to include pertaining to this project. A copy of your CDB pre-qualification must be included in your response. Three copies of your statement of qualifications must be sent to Robyn Schuline, 117 Hovey Hall, 1220 Purchasing Office, Normal IL 61790-1220. Statements of Qualifications are due March 17, 2006, 2:00 PM Central Standard Time.

For additional information, contact:
Robyn Schuline
Campus Box 1220
Illinois State University
Normal, IL 61790-1220
Phone: (309) 438-5529
FAX: (309) 438-5555
E-Mail: rsschul@ilstu.edu
Only those firms which meet the following qualifications will be considered:
  • Submitted 3 copies of their qualifications.
  • Licensed to practice as an architect, landscape architect, or engineer in the State of Illinois.
  • Pre-qualified with the State of Illinois Capital Development Board.
  • Registered and authorized to do business in the State of Illinois.
  • Utilize an AutoCAD compatible system to provide documents.
Selection will be consistent with the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act (30 ILCS 535/1).