To obtain documents, log on:
:
Not registered? Register me now
 

Public Higher Education Bulletin

 
Northern Illinois University
QBS #KMC1042014
Request for Professional Services Qualifications (QBS): Architectural/Engineering Design Services
Award Info Published Thursday February 5, 2015
Awarded to:
Consultant: Dewberry Architects, Elgin, IL
Amount: An estimated $850,000
Terms:  One-time transaction
Number of Unsuccessful, Responsive Respondents: 19
The buyer for this procurement is now Scott Olsen, (815) 753-6111.
The University award process may be delayed up to thirty days as this award goes through a state approval process.
This notice has been modified
Published Wednesday September 24, 2014
Addendum #3 has been issued. Please print/download the additional document.
This notice has been modified
Published Thursday September 18, 2014
Addendum #2 has been issued. Please print/download the two documents (one Word and one PDF document) that consist of Addendum #2.
This notice has been modified
Published Monday September 15, 2014
Addendum #1 has been issued. Please print/download the additional document.
First published Wednesday, September 3, 2014
Project Description
Northern Illinois University is seeking qualified architectural engineering design and planning firms to provide professional design and planning services for the redevelopment of Holmes Student Center located at Lucinda Avenue and Normal Road on the Main Campus in DeKalb, Illinois. The project will include Building Assessment, Facilities Programming, Concept Alternatives and Schematic Design for renovation and adaptive re-use of the 300,000 square foot Campus Center. Additionally, Design Development through Construction Documentation will be required for select projects. This project will be administered by Northern Illinois University, DeKalb.
Letter Submission
Qualifications and supporting materials will be accepted at the address below until 4:00 PM, Friday October 3, 2014:

Thomas L. Wroblewski, Director
Architectural / Engineering Services
Northern Illinois University
180 West Stadium Drive
DeKalb, IL 60115

The architect/engineer must work within all existing and established University project requirements and protocol including digital imaging, electronic specifications, and AutoCad/BIM drawing system.

Pre-Submittal Conference: A pre-submittal conference will be held Wednesday, September 17, 2014, at 10:30 AM CDT at the Holmes Student Center. This will provide interested firms an opportunity to tour the building, understand the vision and context for this project, and ask questions of NIU.
For specific pre-submittal conference information, submittal requirements and additional information refer to the attached file.

Prior to contract award, the selected firm will be required to complete and submit a “Disclosures and Conflicts of Interest” form. The completed form and all information shown thereon will be provided to the Procurement Policy Board.
State Purchasing Officer - Lee Saulter
Only those firms which meet the following qualifications will be considered:
  • Licensed to practice as an architect, landscape architect, or engineer in the State of Illinois.
  • Pre-qualified with the State of Illinois Capital Development Board.
  • Registered and authorized to do business in the State of Illinois.
  • Utilize an AutoCAD compatible system to provide documents.
  • There is no BEP goal for this procurement.
Selection will be consistent with the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act (30 ILCS 535/1).

This transaction is subject to the State Board of Elections registration and certification requirements of Public Act 095-0971.

The State of Illinois has a policy to encourage prospective vendors to hire qualified veterans, minorities, females, persons with disabilities and ex-offenders.

Bulletin Navigation

 
To obtain documents, log on:
Specification Documents
  • FinalCharretteReport25Feb2014.pdf (2 MB)
  • KMC1042014.docx (67 KB)
  • KMC1042014Addendum1.docx (33 KB)
  • KMC1042014Addendum2.docx (38 KB)
  • KMC1042014Addendum3.docx (36 KB)
  • QBS_Sign-InSheetsPre-SubmittalConf14-09-17.pdf (3 MB)