To obtain documents, log on:
:
Not registered? Register me now
 

Public Higher Education Bulletin

 
Southern Illinois University Edwardsville
SoleSource #2370

Announcement of a Sole Source Purchase

Award Info Published Saturday November 26, 2022

Behrmann CompanySt. Louis, MO

  • Amount: $191,434
  • Terms: One-time transaction

Summary

Vendors

1 total
0 BEP vendors
0 VBP vendors
0 Small businesses

The University award process may be delayed up to thirty days as this award goes through a state approval process.

The hearing has been cancelled
Published Monday November 21, 2022
The hearing has been cancelled since no vendors registered to attend or submitted comments regarding this notice.
First published Wednesday, November 2, 2022
The University awarded a contract for Boiler Replacement to Behrmann Company, St. Louis, MO, for $191,434.
Southern Illinois University Edwardsville (SIUE) requires a vendor to replace two (2) existing boilers at Alumni Hall and three (3) existing boilers at Lovejoy Library with new Lochinvar Boilers. The replacement boilers will have the same capacity and footprint as the existing boilers in order to minimize modifications needed to minimize costs. Two (2) boilers are 1500 MBH input, 125 PSI, and three (3) boilers are 850 MBH, 125 PSI. The new boilers have a full modulation firing with 25:1 turndown. The old units were 10:1 and 20:1 therefore, the new boilers are more energy efficient.
The University has determined that this purchase is only economically available from this source because the compatibility of equipment, accessories, replacement parts, or service is a paramount consideration.

For instructions on how to obtain a comprehensive purchase description, disclosure or contract forms, contact:
Gina Grace
Purchasing Campus Box 1012
Southern Illinois University Edwardsville
Edwardsville, IL 62026-1012
Phone: (618) 650-3522
FAX: (618) 650-3251
Chief Procurement Officer - John Donato
State Purchasing Officer - Catherine Bradbury

We will hold a public hearing at the date, time and location specified below, if we receive a request to testify regarding the sole source determination. We will also hold a hearing if any vendor submits a signed statement showing the capability to provide the stated supplies/services at or below the amount indicated.

The public hearing allows any interested party the opportunity to testify for or against the sole source determination as described in this notice. The purpose of the hearing is to receive information from the public in a reasonable manner. Formal rules of evidence will not apply. The hearing officer will produce minutes of the hearing and may record it in order to aid in the production of the minutes. After conclusion of the hearing we will decide whether the sole source determination was appropriate.

We must receive any request to testify and any vendor statement no later than the registration date and time indicated below. If we do not receive a timely request or statement, we will not hold the hearing. We reserve the right to cancel the procurement prior to any scheduled hearing. Please confirm the status of the hearing with the Hearing Contact.

Hearing Details

Date:
November 23, 2022
Time:
9:00 AM
Location:
Stratton Building
Room 511
401 S. Spring Street
Springfield, IL

Hearing Contact:
Catherine Bradbury
Phone: (217) 993-2327
Additional Information: All sole source hearings under the jurisdiction of the Chief Procurement Officer for Higher Education will be conducted by tele-conference only until the in-person option is reinstated.
Date, time, and location are subject to change and/or cancellation. It is the responsibility of potential participants to confirm these details prior to attendance.

Registration Deadline:
November 18, 2022
Register with:
Catherine Bradbury
Phone: (217) 993-2327

The State of Illinois has a policy to encourage prospective vendors to hire qualified veterans, minorities, females, persons with disabilities and ex-offenders.

Bulletin Navigation

 
To obtain documents, log on:
Sole Source Justification
  • SSJF2370-BehrmanBoilers.pdf (833 KB)
Sole Source Justification Part 2
  • 2370Pt2.pdf (85 KB)