To obtain documents, log on:
:
Not registered? Register me now
 

Public Higher Education Bulletin

 
University of Illinois at Urbana-Champaign
QBS #01S07

Request for Professional Services Qualifications (QBS): South Research Park Sanitary Sewer Study

This solicitation will not be awarded
Published Thursday April 26, 2001
 
At the present time, we are re-evaluating the process for deciding the best method for providing sanitary service to the South Research Park. It is probable that some professional effort will yet be required to assist us in making that decision.
First published Tuesday September 5, 2000
Qualifications and supporting materials will be accepted at the address below until 4:00 PM, Friday September 22, 2000:
University of Illinois at Urbana-Champaign
207 Henry Administration Building
506 South Wright Street
Urbana, IL 61801-3684

Project Description
The project consists of providing professional engineering to evaluate the best method of providing sanitary sewer service to the expanded boundaries of the South Center of the Research Park at the UIUC. The specific service area is bounded by St. Mary's Road, Fourth Street extended, Windsor Road and South First Street. Continued development within this area is contingent upon the provision of sanitary sewer service.

The closest existing sanitary sewer service is at the UIUC South Lift Station located east of the new service area. The South Lift station pumps, via the Matthews Avenue sanitary sewer, to the North Lift Station. The North Lift Station pumps to a UCSD interceptor.

The engineer shall work with UIUC personnel in conjunction with personnel from the Urbana-Champaign Sanitary District (UCSD). Available data includes previous studies of the Matthews Avenue Sanitary Sewer system completed in the late 1980s, and projected flows from the new service area.

Options for providing service include, but are not limited to: permanent and/or temporary flow to the existing South Lift Station; provision of new interceptor sewer by the UCSD; and a new treatment plant. Components of the evaluation shall include cost and implementation time.

Proposals
Firms should submit four copies of the following: a letter of interest, a copy of its CDB prequalification letter, and a 255 form (use CDB SF 255 dated 7/1/99) by 4:00 p.m., Friday, September 22, 2000 addressed to:

University of Illinois at Urbana-Champaign
Office for Project Planning & Facility Management
Illini Union Bookstore
807 S. Wright St., Suite 320
Champaign, IL 61820
ATTN: Roland R. Kehe, AIA
Email address: rkehe@uiuc.edu

Architect/Engineer selection will be consistent with the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act (30 ILCS 535/1).

Only those firms which meet the following qualifications will be considered for selection:

  • Licensed to practice as an architect in the State of Illinois
  • Prequalified with the State of Illinois Capital Development Board
  • Business presence in Illinois
  • Utilization of AutoCAD compatible system
(Submitted by Katharine Kral, State Purchasing Officer.)

Selection will be consistent with the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act (30 ILCS 535/1).