Project Description
In 1984 the Football Facilities Addition to the Northeast Tower of Memorial Stadium was completed. The project remodeled and expanded the locker and training facilities and added offices, meeting rooms, and a weight training facility for the Division of Intercollegiate Athletics Football Program. To meet current needs of the program it is now desirable to expand the locker room, training, and meeting rooms by remodeling the existing areas and adding space above the existing weight room.
The $3.0 million project will remodel 9000 gsf of existing space and add 4500 gsf of new space. The current schedule is to bid the project in February; construction must be completed by August 1, 2002. The scope of services for the Construction Manager will be to develop the overall construction schedule, establishing milestones to evaluate the schedule, monitor contractor submittals, shop drawings, procurement and construction progress.
Consultant Submittals
Firms should submit three copies of the following: letter of interest and a company brochure (prepared within the last six months) indicating the qualifications of the firm and the personnel proposed to be assigned to perform the services. Also included shall be client references from similar projects. Information is due by 4:00 p.m., Wednesday, January 2, 2002 addressed to:
University of Illinois at Urbana-Champaign
Office for Planning, Design & Construction
Illini Union Bookstore
807 S. Wright St., Suite 320
Champaign, IL 61820
ATTN: Roland R. Kehe, AIA
Email address: rkehe@uiuc.edu
Consultant selection will be consistent with the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act (30 ILCS 535/1).
Consultant Qualifications
Only those firms which meet the following qualifications will be considered for selection: