Vendor: Kroeschell Engineering Co., Inc.
Change Order Amount: $195,052.20
This is a Change Order to replace the 6" and 8" mains and vertical branch piping, including associated isolation valves (not covered under RFP007), serving drycoolers A, B, C, D, E, and F. Proposal shall include all material and labor including added costs to operate the temporary cooling system required to complete this work.