To obtain documents, log on:
:
Not registered? Register me now
 

Public Higher Education Bulletin

 
University of Illinois at Chicago
Bid #698-703-00-PH3

Invitation for Construction Bid: Adaptive Reuse Phase III

Award Info
Published Monday March 8, 2004
 
Awarded to:
Contractor:  Multiple contractors:
  • Integrated Construction, Chicago, IL ($2,192,510 for Division I - General Work)
  • A&H Plumbing, Elk Grove Village ($318,000 for Division II - Plumbing Work)
  • Global Fire Protection Downers Grove, IL ($110,746 for Division IIB Fire Protection Work)
  • Ortiz Mechanical, Orland Park, IL ($184,597 for Division III - Heating, Piping, Refrigeration, & Temperature Control Work)
  • Climatemp Inc., Chicago, IL ($158,000 for Divsion IV - Ventilation & Air Distribution Work)
  • Divane Brothers, Franklin Park, IL ($382,700 for Division V - Electrical Work)

Amount:  A total of $3,346,553
Terms:   One-time transaction
Number of Unsuccessful, Responsive Bidders:
The University award process may be delayed up to thirty days as this award goes through a state approval process.
First published Monday October 28, 2002
Sealed bids will be accepted at the address below until 10:00 AM, Tuesday January 14, 2003:
University of Illinois at Urbana-Champaign
207 Henry Administration Building
506 South Wright Street
Urbana, IL 61801-3684

The Board of Trustees of U of Illinois Facilities Planning and Programs hereby requests sealed bids for construction work on the South Campus Development Phase III Adaptive Reuse at Chicago project.

Project Description
The Adaptive Re-use Phase III project is an office and retail building located on Maxwell St. in the UIC South Campus Development Area. The building construction is steel joists, steel beams and steel columns with masonry load bearing walls on drilled piers. There is a partial basement below a portion of the building and the Maxwell Street face consists of the reconstruction of existing dismantled facades.

Bid Proposals
Separate bids will be received for the University of Illinois at Chicago South Campus Development - Phase III Adaptive Re-use for the following contract divisions up to the hour of 10:00 a.m., prevailing time, on Friday, January 10, 2003:

Division IIA - Plumbing
Division IIB - Fire Protection
Division III - Heating, Piping and Refrigeration
Division IV - Ventilation and Air Distribution
Division V - Electrical

Bids for Division I General, will be received up to the hour of 10:00 a.m., prevailing time, on Tuesday, January 14, 2003.

Submit all proposals to the Board of Trustees at:

The Board of Trustees of the University of Illinois, c/o
Office of the Vice Chancellor for Administration (MC 106)
1140 South Paulina
Chicago Illinois 60612
Attn: James S. Gimpel, FAIA
jamesg@uic.edu

Bids will be received up to the hour of 10:00 AM local time, on Tuesday, January 14, 2003. Immediately after closing time for receiving bids, they will be opened publicly and read.

For bidding documents and further information, contact

The University Office for Facilities Planning and Programs website at:
http://www.uofpp.uillinois.edu/procure.htm

Pre-Bid Conference
A pre-bid conference will be held at the South Campus Development Team Office, 1401 South Halsted Chicago, IL at 10:00 a.m., prevailing time, on Friday, November 8, 2002. Representatives of the owner and the architect/engineer will be present to answer questions regarding the project and bidding procedures. All prospective bidders are urged to attend. Division I contractors (and Masonry subcontractors) may inspect dismantled and stored facade materials at 2333 S. Rockwell, Chicago, IL from 10:00 a.m. to 12:00 noon on Tuesday, November 19, 2002. The architect will be on site at that time to address questions.

(Submitted by Katharine Kral, State Purchasing Officer.)

Bulletin Navigation

 
No documents are available.