University of Illinois at Chicago
Bid #BA699C16051
Invitation for Construction Bid: UIC College of Engineering Modular Design Building
Change Order
Published Monday April 1, 2019
Contractor: Chicago Commercial Construction
Change Order Amount: $106,397.31

Import stone and install geotextile fabric at Service Yard
The State Purchasing Officer for this procurement is now John Knittle.
The University award process may be delayed up to thirty days as this award goes through a state approval process.
Award Info Published Thursday November 30, 2017
Awarded to:
Contractor: Chicago Commercial Construction, Chicago, IL
Amount: $8,788,850
Terms:  One-time transaction
Number of unsuccessful, responsive bidders: 2
Comments:
Division 1 - Successful, responsive bidder:
30% MAFBE

Division 1 - Unsuccessful, responsive bidders:
The Bowa Group $8,834,643 (40% MAFBE)
Madison Construction $9,076,370 (30% MAFBE)
The University award process may be delayed up to thirty days as this award goes through a state approval process.
This notice has been modified
Published Tuesday September 19, 2017
Divisions 9, 15, 18, 27, 28 and 34 will now be the responsibility of the Division 1 - General Work.

The bid opening date for Division 1 - General Work has been changed to October 5, 2017.
This notice has been modified
Published Thursday September 14, 2017
The project-specific prequalification deadline is 4:00 p.m. prevailing time on 9/14/17
First published Thursday, August 31, 2017
Project Description
The UIC College of Engineering (CoE) Building 629 Project consists of a new stand-alone building on the UIC East Campus. The site is at the southeast corner of Taylor Street and Morgan Street on the north side of Parking Lot 5. The existing site is a flat parking lot. There are no existing buildings on the site. The base building design is approximately 50,500 SF with two (2) add-alternate additions which would bring the total area of the building to approximately 57,500 SF. The building includes spaces for students, researchers, and faculty: a high-bay structural testing lab for the Civil and Materials Engineering (CME) Department, research laboratories and offices for the Chemical Engineering (CE) Department, research laboratories and offices for the Mechanical and Industrial Engineering (MIE) Department, research laboratories/computational labs and offices assigned to the Dean of the College as flexible space, and general building functional spaces. The project has a USGBC LEED (version 2009) goal of Gold level certification. The existing SES (Science and Engineering South) building to the east houses a highly vibration sensitive microscope and the labs in the CoE Building 629 will contain vibration sensitive equipment as well.

A MANDATORY pre-bid meeting will be held in Room. 243, 2nd Floor of Building 963 located at 1140 S. Paulina on 09/06/17 at 2:00 pm prevailing time. All prospective bidders are REQUIRED to attend.

This Project is located at: 945 West Taylor Street - Southeast corner of Taylor and Morgan Streets.
Division 1 - General Work
Sealed bids will be accepted below until 10:00 AM, Thursday, October 5, 2017:
At the following address
The Board of Trustees of the University of Illinois
c/o Office for Capital Programs
1140 South Paulina, Suite 204 MC 892
Attention: Eric Luchetta-Stendel (ericl@uic.edu) 312-355-5429
Chicago, IL 60612
State Purchasing Officer - John Knittle
All responses must include:
  • There is a BEP goal for this procurement. See solicitation documentation for details.
  • The contract(s) for this solicitation could exceed $50,000 annually.

This transaction is subject to the State Board of Elections registration and certification requirements of Public Act 095-0971.

The State of Illinois has a policy to encourage prospective vendors to hire qualified veterans, minorities, females, persons with disabilities and ex-offenders.

Bulletin Navigation

 
To obtain documents, log on:
Specification Documents
  • BA699C16051ad.pdf (85 KB)