University of Illinois at Chicago
Invitation for Construction Bid: AIM Admin Suite Buildout
Addendum 3 supplements and amends the project manual and the drawings and shall be taken into account in preparing this proposal and shall become a part of the contract documents. Bidders must acknowledge receipt of this addendum by listing the number and date, where provided, on the bid form (document provided by the contractor.) This Addendum updates drawings, only and does not alter the previously published bid date(s).
Addendum 2 supplements and amends the project manual and the drawings and shall be taken into account in preparing this proposal and shall become a part of the contract documents. Bidders must acknowledge receipt of this addendum by listing the number and date, where provided, on the bid form (document provided by the contractor.) This addendum updates drawings, specifications, provides RFI responses, and updates the previously published bid dates.
Bid Submission Dates:
Divs 3, 4, & 5: Change from 4/26/2023 to 5/5/2023. Time remains 1 pm. Div 1: Change from 5/1/2023 to 5/10/2023. Time remains 1 pm.
Bid Opening Dates:
Divs 3, 4, & 5: Change from 4/26/2023 to 5/5/2023. Time remains 2 pm. Call-in meeting information remains the same. Div 1: Change from 5/1/2023 to 5/10/2023. Time remains 2 pm. Call-in meeting information remains the same.
Addendum 1 supplements and amends the project manual and the drawings and shall be taken into account in preparing this proposal and shall become a part of the contract documents. Bidders must acknowledge receipt of this addendum by listing the number and date, where provided, on the bid form (document provided by the contractor.) This addendum provides Prebid meeting and Project Specific Prequalification information, updates drawings, responses to RFIs, and updates the previously published bid dates.
• Bid Submission Dates: Divs 3, 4, & 5: Change from 4/19/2023 to 4/26/2023. Time remains 1 pm. Div 1: Change from 4/24/2023 to 5/1/2023. Time remains 1 pm.
• Bid Opening Dates: Divs 3, 4, & 5: Change from 4/19/2023 to 4/26/2023. Time remains 2 pm. Call-in meeting information remains the same. Div 1: Change from 4/24/2023 to 5/1/2023. Time remains 2 pm. Call-in meeting information remains the same.
First published Wednesday, March 29, 2023
Project Description
Installation of twenty-four (24) private offices, shell space to accommodate twelve (12) open workstations, one (1) large conference room and two (2) single use toilets in existing space.
This Project is located at: Clinical Sciences North Building 820 S. Wood St. 4th floor East wing.
A MANDATORY pre-bid conference for all parties interested in bidding the project will be held in College of Medicine Research Building 909 S. Wolcott Room 1020 Enter at Medical Sciences Building 835 S. Wolcott at 11:30am on 4/5/2023. Representatives of the Owner and the Professional Services Consultant will be present to answer questions regarding the project and bidding procedures. All prospective bidders are REQUIRED to attend.
See attached for complete details.
Division 01 - General Work
Sealed bids will be accepted below until 1:00 PM, Wednesday, May 10, 2023:
At the following address
via electronic bidding
Chicago, IL 60612
The project manual, drawings and all addenda are available after a one-time electronic registration for electronic viewing at no cost at http://dfs.cushingco.com/uic.htm.
Contact Information:
John O. Lewis
Chicago, IL 60612
Phone: (312) 996-6804
E-Mail:jolewis@uic.edu
Division 03, 04, & 05
Sealed bids will be accepted below until 1:00 PM, Friday, May 5, 2023:
At the following address
via electronic bidding
Chicago, IL 60612
The project manual, drawings and all addenda are available after a one-time electronic registration for electronic viewing at no cost at http://dfs.cushingco.com/uic.htm.
Contact Information:
John O. Lewis
Chicago, IL 60612
Phone: (312) 996-6804
E-Mail:jolewis@uic.edu
For instructions on how to obtain a comprehensive purchase description, disclosure or contract forms, contact:
Chris Rogan
Chief Procurement Officer - John Donato
State Purchasing Officer - Bridget McHatton
All responses must include:
- There is a 30 percent BEP goal for this procurement. See solicitation documentation for details.
- There is a 3 percent Veteran-owned business goal for this procurement. See solicitation documentation for details.
- The contract(s) for this solicitation could exceed $50,000 annually.
This transaction is subject to the State Board of Elections registration and certification requirements of Public Act 095-0971.
The State of Illinois has a policy to encourage prospective vendors to hire
qualified veterans, minorities, females, persons with disabilities and ex-offenders.