Bid #BAU12145
Invitation for Construction Bid: Abbott Power Plant - Gas Boiler Replacement
This solicitation will not be awarded
Published Tuesday June 3, 2014
Project to be rebid with revised scope.
This notice has been modified
Published Monday April 28, 2014
The bid opening date for Division 1 has been changed to May 15, 2014.

The bid opening date for Divisions 2, 3, and 5 has been changed to May 13, 2014.

Both bid openings will be held in Room 1830, Physical Plant Service Building, 1501 S. Oak Street, Champaign.

We are having a second mandatory prebid meeting to be held on April 30, 2014 at 1:00 p.m. in Physical Plant Service Building, 1501 S. Oak Street, Room 128, Champaign, Illinois.

All prospective bidders that did not attend the first mandatory prebid meeting held on April 8, 2014 are REQUIRED to attend. Attendance to the second mandatory prebid meeting to be held on April 30, 2014 is OPTIONAL for the prospective bidders that did attend the first mandatory prebid meeting held on April 8, 2014.
First published Tuesday, April 1, 2014
Project Description
This project requires the removal of Gas Boiler #3 and Gas Boiler #4. A new, owner provided, 850 psig 740 F boiler producing 175,000 lb/hr of superheated steam will be installed into the position currently held by Gas Boiler #4. The new boiler will be capable of firing natural gas and fuel oil. Demolition of the existing boilers will include removal of associated fuel oil skids, natural gas piping, steam piping, feed water piping and feedwater pump #4, flue gas economizer, forced draft fan, inlet air duct work, outlet duct work and and electrical and instrumentation and control wiring and panels. The existing boilers will be removed through an opening to be made in the power plant west wall. Structural steel modifications to the columns and support steel will be required for removal and installation of the new boiler. Installation of the new boiler will include steam tie in to the plant 850 psig steam header, installation of a new forced draft fan with variable frequency drive, supporting instrumentation and control installation, a new feedwater/flue gas economizer, a new boiler stack, and flue gas recirculation system. The building wall opening will be covered with a new roll up door to allow for future installation of additional gas boilers. Receipt and transportation of the boiler from a rail siding to be determined to Abbott Power Plant and installation into the plant is part of the contractor's responsibility. The contractor must include in their bid a construction bond for the boiler starting when the boiler is lifted off of the rail car through final accepted installation of the boiler at the power plant.

Please see the attached file for more information.
Division 1
Sealed bids will be accepted at the address below until 1:00 PM, Thursday, May 15, 2014:
The Board of Trustees of the University of Illinois c/o
Facilities and Services - UIUC
1501 South Oak Street, Room 115
Attention: James Sims, jimsims@illinois.edu, (217) 244-6425
Champaign, IL 61820
Divisions 2, 3, and 5
Sealed bids will be accepted at the address below until 1:00 PM, Tuesday, May 13, 2014:
The Board of Trustees of the University of Illinois c/o
Facilities and Services - UIUC
1501 South Oak Street, Room 115
Attention: James Sims, jimsims@illinois.edu, (217) 244-6425
Champaign, IL 61820
State Purchasing Officer - John Knittle
All responses must include:
  • There is a BEP goal for this procurement. See solicitation documentation for details.

This transaction is subject to the State Board of Elections registration and certification requirements of Public Act 095-0971.