Invitation for Construction Bid: Design Center
Change Order
Published Friday January 18, 2019
Contractor: Duce Construction Company
Change Order Amount: $162,978.34

This is the CHANGE ORDER with the final amount for the field directive published on 12/12/2018 in the amount of $162,978.34 for mass excavation at the Design Center needed for an appropriate earth retention system at the northwest corner of the basement.
The State Purchasing Officer for this procurement is now John Knittle.
The University award process may be delayed up to thirty days as this award goes through a state approval process.
Change Order
Published Wednesday December 12, 2018
Contractor: Duce Construction Company
Change Order Amount: $162,978.34

This is a FIELD DIRECTIVE for mass excavation for Design Center is stalled due to need for appropriate earth retention system at the northwest corner of the basement, at the area way, to protect existing 42" diameter chilled water lines near the north area way wall. The sheet pile earth retention system included in the Division 15 contractor bid is being replaced with a drilled, H-pile earth retention system which can be located adjacent to the north wall of the area way (further from the piping).
The State Purchasing Officer for this procurement is now John Knittle.
The University award process may be delayed up to thirty days as this award goes through a state approval process.
Award Info Published Tuesday September 25, 2018
Awarded to:
Contractor: Duce Construction Company, Champaign, IL
Amount: $5,574,000
Division of Work: Division 15 (unsuccessful, responsive bidders: 3)
Terms:  One-time transaction
Number of unsuccessful, responsive bidders: 3
Comments:
Successful Responsible Bidder

Duce Construction Company, MAFBE 20%, $5,574,000

Unsuccessful Responsive Bidders

Grunloh Construction, Effingham, MAFBE 21%, $6,825,000

Poettker Construction, Breese, MAFBE 0%, $7,574,700

Williams Brothers Construction, Inc, Peoria, MAFBE 20%, $6,325,000

The State Purchasing Officer for this procurement is now John Knittle.
The University award process may be delayed up to thirty days as this award goes through a state approval process.
This notice has been modified
Published Friday August 17, 2018
Bid opening date has been changed to August 20, 2018.

Additional clarifications are provided by this Addendum #3.

This Addendum is also available at CityBlue Technologies online Plan Room, https://www.uillinois.planroom.com.
First published Friday, July 27, 2018
Project Description
This project consists of construction of the new Design Center, which is comprised of approximately 60,000 gross square feet of building, two (2) levels; Ground level and Basement level. This new work includes general, plumbing, heating with temperature control work, ventilation, electrical, sprinkler, concrete, site, structural steel and window construction, as indicated on the Contract Documents. Work specifically included in the Division 15 - Concrete Re-Bid shall be as indicated in the Bidding Requirements and Scope of Work dated 27 July, 2018. The Bid Documents for this Division 15 Re-Bid include the Bid Documents dated 2/21/2018, which include Drawing Sets numbered 1 through 4, Specification sets numbered 1 through 5 and the following Addenda issued during the 2/21/2018 bid period: Addendum 1 dated 2/28/2018, Addendum 2 dated 3/7/2018, Addendum 3 dated 3/13/2018, Addendum 4 dated 3/20/2018 and Addendum 5 dated 3/23/2018. It also includes Bid Documents for the Division 27 - Sitework dated 16, May 2018 and Addenda issued during the 5/16/2018 bid period: Addendum 1 dated 5/23/18 and Addendum 2 dated 5/25/18.

This Project is located at: The project site is located along 4th Street, at the west end of an open campus green known as the Military Axis. The site is bounded by 4th Street to the west, the pedestrian sidewalk located just south of Huff Hall to the north, the existing Art+Design parking lot to the south, and a point approximately midway between 4th Street and 6th Street to the east as indicated on the Contract Documents. Utility extensions to connect to existing campus utilities will extend beyond these general project boundaries - extent as indicated on the Contract Documents.

See attached for more information.
Division 15 Concrete Work
Sealed bids will be accepted at the address below until 2:30 PM, Friday, August 17, 2018:
The Board of Trustees of the University of Illinois
c/o Facilities and Services
1501 South Oak Street, Room 115
Attention: Kevin Price, kgprice@illinois.edu, 217-300-4245
Champaign, IL 61820
State Purchasing Officer - John Knittle
All responses must include:
  • There is a BEP goal for this procurement. See solicitation documentation for details.
  • The contract(s) for this solicitation could exceed $50,000 annually.

This transaction is subject to the State Board of Elections registration and certification requirements of Public Act 095-0971.

The State of Illinois has a policy to encourage prospective vendors to hire qualified veterans, minorities, females, persons with disabilities and ex-offenders.

Bulletin Navigation

 
To obtain documents, log on:
Specification Documents
  • ADDENDUM3_BAU16015R2.pdf (171 KB)
  • BAU16015R2ad.pdf (81 KB)