University of Illinois at Chicago
RFP #PSS630-700-03GrpD

Request for Proposal: Recreation Center Project

Award Info
Published Thursday March 3, 2005
 
Awarded to:
Vendor:  multiple contractors
Amount:  $7,429,354
Terms:   One-time transaction
Number of Unsuccessful, Responsive Respondents: 28
Comments:
For additional details, please contact the construction manager by sending email to jsanderson@pcec.net (Mr. Jason Sanderson, Project Engineer.)
The University award process may be delayed up to thirty days as this award goes through a state approval process.
First published Monday August 16, 2004
Sealed responses will be accepted at the address below until 12:00 PM, Monday September 6, 2004:
University of Illinois at Urbana-Champaign
207 Henry Administration Building
506 South Wright Street
Urbana, IL 61801-3684

Project Description
Construction of a new 3-story structural steel 155,110 SF East Campus Recreation Facility for the University of Illinois at Chicago. This project will ultimately involve the following components of work; site work, mechanical mezzanine, pool, curtain wall glazing, structural frame (including long span elements), metal wall panels, precast, brick masonry, climbing wall and typical athletic center interior finishes. The total construction value of this project is estimated to be worth approximately $25 million.

Bid Packages - Group D,Included CSI specification sections, and estimated construction value:

Bid Package-15 Exterior Concrete Flatwork & Asphalt Paving - $ 165,000

  • 02741 - Hot-mix Asphalt Paving
  • 02751 - Cement Concrete Pavement
  • 02775 - Sidewalks
  • 11150 - Parking Control Equipment
Bid Package-16 Drywall - $ 2,043,046
  • 09260 - Gypsum Board Assemblies
Bid Package 17 Acoustical Ceilings - $44,100.00
  • 09510 - Acoustical Ceilings
Bid Package-18 Rough Carpentry - $357,000
  • 06115 - Wood Blocking
  • 10450 - Pedestrian Control Devices
  • 10510 - Plastic Laminate Lockers
  • 10506 - Locker Room Benches
Bid Package - 19 Doors/Frames/Hardware - $ 147,000
  • 08110 - Steel Doors & Frames
  • 08210 - Wood Doors
  • 08710 - Door Hardware
Bid Package-20 Spray on Fireproofing - $248,500
  • 07815 - Cementious Fireproofing
  • 07816 - Interior Intumescent Fireproofing
Bid Package - 21 Building Automation - $325,000
  • 15950- Controls
Bid Package- 22 Chemical Toilets - $9,000
  • 011-460 Temporary Toilets
Bid Package- 23 Testing Services - $40,000
  • 011-880 Testing Services
Bid Package- 24 Dumpsters - $60,000
  • 011-205 Dumpsters
Prequalification Copies of the application may be obtained from the Construction Manger by sending a fax to (847) 925-1372 or email to jsanderson@pcec.net expressing interest to the attention of Mr. Jason Sanderson, Project Engineer. The project specific prequalification process will begin Monday August 16, 2004. The prequalification deadline for bid group D is 12:00 noon prevailing time on Tuesday, September 7, 2004. Prequalification applications received after the deadline will be returned unopened to the applicant. Prequalification is only required of Prime Contractors for each bid package. All applicants must be able to demonstrate adequate design capabilities, as applicable to their respective scope of work. All applicants will also be required to provide adequate bonding per the university requirements. Criteria for evaluation of applicants will include company organization, relevant work experience, volume and type of work, financial standing, planning and scheduling capabilities, safety record, affirmative action and labor compliance records, other trade specific qualifications and annual pre-qualification status with University of Illinois Chicago (for annual pre-qualification go to the University's pre-qualification website at http://notes.ocp.uiuc.edu:8888/ ).

Notice of Prequalification
After the prequalification deadline, all those applicants who are prequalified for the project will be notified by the construction manager. Bid documents will be distributed by the construction manager to only those applicants who are prequalified.

(Submitted by Kathe Shinham, State Purchasing Officer.)