The University award process may be delayed up to thirty days as this award goes through a state approval process.
First published Thursday, July 10, 2008
Project Description Master Plan for the future development of the Brookens Library. Study should include analysis and recommendations for space utilization, improving functional relationships, reducing deferred maintenance, improving HVAC systems, and updating systems to accommodate modern library and information technologies. It should include building, ADA, and Life Safety code analyses, and be aimed at providing a student friendly, vibrant public area, that will meet current and future needs, for supporting teaching and learning.
Please see the attached files for more information.
Letter Submission
Qualifications and supporting materials will be accepted at the address below until 3:00 PM, Thursday July 31, 2008:
Facilities and Services Business Services Building, Room 43 Attention: Michael Doerr (doerr.michael@uis.edu) 217-206-7375
Springfield, IL
67203
Only those firms which meet the following qualifications will be considered:
Licensed to practice as an architect, landscape architect, or engineer in the State of Illinois.
Pre-qualified with the State of Illinois Capital Development Board.
Registered and authorized to do business in the State of Illinois.
Utilize an AutoCAD compatible system to provide documents.
Selection will be consistent with the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act (30 ILCS 535/1).