University of Illinois at Urbana-Champaign
QBS #PSSU06022
Request for Professional Services Qualifications (QBS): Sanitary Sewer Extension
First published Thursday, September 22, 2005
Qualifications and supporting materials will be accepted at the address below until 4:00 PM, Friday October 7, 2005:

University of Illinois at Urbana-Champaign
207 Henry Administration Building
506 South Wright Street
Urbana, IL 61801-3684

Description of Project
New building construction and planned development have created a need for new sanitary sewer. To accommodate this need the Urbana-Champaign Sanitary District is constructing a new sanitary sewer lift station south of Windsor Road and First Street in Champaign. This proposed sanitary sewer extension would serve the area to the north and east of this new lift station.

The project shall consist of:

1.Preliminary design of a sanitary sewer from south of the intersection of Saint Mary's Road and First Street to the new lift station, south of Windsor Road and First Street, in Champaign.

2.Final design and construction documents for a permanent portion of the total length from south of the intersection of Saint Mary's Road and First Street, to just south of Hazelwood Drive and South First Street. At this southern terminus of the permanent sewer a temporary connection shall be placed by routing the sewer west under South First Street to an existing sewer.

It is critical that the final design, as described in Item 2, above, be permanent, thereby allowing construction in phases.

Timely completion of the final design and construction documents is critical. The final completion date for the project is May 1, 2006.

The basis of design shall consist of serving an area bounding by Saint Mary's Road on the north, Goodwin Avenue extended on the east, Windsor Road on the south, and the CN railroad tracks on the west. In addition, a force main is being constructed, by another project, entering the northern terminus of this sewer. A sanitary sewer master plan was completed in 1991, and is a necessary input to this design.

Project Area GSF:N/A
Project Area NASF:N/A
Project Budget:$225,000 (est.)
Construction Budget: $175,000 (est.)

Professional Services Consultant Submittal
Firms should submit four hard copies and one electronic copy of a CDB SF 255 form (section 8 should be modified to include additional information of relevant projects) and a copy or your current CDB prequalification application. Electronic copy shall be submitted (in pdf format), using the following URL to complete and submit the form: http://notes.ocp.uiuc.edu:8888/prism/ocpweb.nsf/projectsuiuc

Hard copies (This form can be found on the CDB website at http://www.cdb.state.il.us/ formspublications.shtml) once completed, shall be submitted to the address noted below.

Project Contact
Facilities & Services
1501 South Oak Street
Champaign, IL 61820
Edward J. Scopel, Associate Campus Architect (e-scopel@uiuc.edu)

Specific, scope-related questions should be directed to Keith Erickson, krericks@uiuc.edu.

The project will be administered using the owner's web-based project management system. PRZM was developed to maximize the potential of the Internet in allowing project team members to access and exchange project information. PRZM supports team collaboration in management and interaction, as well as a team member empowerment on a multi-layer security system.

Minimum PRZM user requirements are as follows:

  • Personal Computer: Microprocessor speed of 100mhz or higher, 32Mb RAM, and a monitor capable of at least 800 x 600 pixel resolution.
  • E-mail: PRZM requires the user to have a valid e-mail account.
  • Software: At various stages of PRZM, users will be required to attach their documents to PRZM.
  • Computer-Aided Drawing (CAD) viewer
The following project-related criteria will be used to evaluate the firms requesting consideration for selection:
  • Current commitments of proposed staff and firm.
  • Overall design quality of the projects submitted
  • Prior experience with projects at the University level
  • Appropriate staff size, professional disciplines, and professional/technical supervision.
  • Proven professional capability and demonstrated prior experience on projects of similar scope and complexity.
  • Ability to meet the project schedule.
  • Overall experience of the proposed consultant team.
  • M.A.F.B.E. participation.
The University of Illinois at Urbana-Champaign encourages the participation of minority- and female-owned consultants and sub-consultants.

For additional information, contact:

The University of Illinois at Urbana-Champaign
217 333-1232

Minimum Qualifications
Only those firms which meet the following qualifications will be considered for selection:

  • Licensed to practice as an engineer in the State of Illinois
  • Prequalified with the State of Illinois Capital Development Board
  • Registered and authorized to do business in the State of Illinois
  • Utilization of AutoCAD compatible system
(Submitted by Kathe Shinham, State Purchasing Officer.)

Selection will be consistent with the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act (30 ILCS 535/1).

The State of Illinois has a policy to encourage prospective vendors to hire qualified veterans, minorities, females, persons with disabilities and ex-offenders.