Announcement of an Exempt Purchase
Change Order Amount: $176,039.50
This Change Order #CO63 replaces the Field Directive #52 published on September 9, 2026. Field Directives are estimates only and CO’s are the final costs.
The University award process may be delayed as this award goes through a state approval process.
Change Order Amount: $176,039.50
This is Field Directive #52. The Field Directive is to supplement a donor gift of landscape design and pergola assembly for an educational Discovery Garden, provide and install necessary extension of infrastructure (storm sewer and underground electrical power for site lighting and electrical service, concrete sidewalk (match existing), structural pergola pier foundations, and site grading, as indicated in ASI 023. Field Directives are estimates only and CO's are the final costs.
The University award process may be delayed as this award goes through a state approval process.
Change Order Amount: $1,036,087.58
This Change Order #CO49 replaces the Field Directive #44 published on July 9, 2026. Field Directives are estimates only and CO’s are the final costs.
The University award process may be delayed as this award goes through a state approval process.
Change Order Amount: $1,036,087.58
This is Field Directive #44. This Field Directive is for scope of work in accordance with the 100% A/V Design Construction Documents which were transmitted to UIUC and BRBI on 03/09/2026. Field Directives are estimates only and CO's are the final costs.
The University award process may be delayed as this award goes through a state approval process.
Change Order Amount: $247,990.28
Change Order #3 to 1.) Provide and install 20-ft of 8-in storm, 240-ft of 6-in storm, valves, floor sink, and hose bibbs (Owner-requested). 2.) This is the change order #3 to Provide and install auto-operators at Restrooms 1048, 1164 and 1166 (Owner-requested). 3.) Metering requirements, distribution requirements (50% PSC Omission / 50% Client Request) 4.) Light fixtures and general materials (Owner-requested). Reference Documents for the IFC set have already been transmitted.
The University award process may be delayed as this award goes through a state approval process.
Change Order Amount: $247,990.28
This is Field Directive #3. 1.) Provide and install 20-ft of 8-in storm, 240-ft of 6-in storm, valves, floor sink, and hose bibbs (Owner-requested). 2.) Provide and install auto-operators at Restrooms 1048, 1164 and 1166 (Owner-requested). 3.) Metering requirements, distribution requirements (50% PSC Omission / 50% Client Request) 4.) Light fixtures and general materials (Owner-requested). Reference Documents for the IFC set have already been transmitted.
The University award process may be delayed as this award goes through a state approval process.
Award Info Published Thursday April 3, 2025
Broeren Russo Builders, Inc.Champaign, IL
- Amount: $29,993,556
- Terms: One-time transaction
- JP Excavating & Trucking, Inc. (subcontractor)BEP [0.46% / $0]
- B.E.C. Mechanical, Inc. (subcontractor)BEP [3.91% / $0]
- Dunker Electric Supply, Inc. (subcontractor)BEP [0.85% / $0]
- Agile Procurement & Consulting Services, LLC dba Agile Supply Company (subcontractor)BEP [0.91% / $0]
- LynchoCo Construction Inc (subcontractor)VBP [3.1% / $0]
- Broeren Russo Construction, Inc. (subcontractor)BEP [26.03% / $0]
Summary
Vendors
The University award process may be delayed as this award goes through a state approval process.