- Industria, Inc.Des Plaines, IL$985,781
- Maman Corp.Elk Grove Village, IL$1,008,000
Invitation for Construction Bid: Chilled Water Upgrades at LHS
Award Info Published Thursday January 25, 2024
Division 1
AGAE Contractors, Inc.Elk Grove Village, IL
- Amount: $708,000
- Terms: One-time transaction
- Elete Construction and Environmental Inc. (subcontractor)BEP [44.49% / $0]
- Enger-Vavra, Inc. (subcontractor)VBP [4.24% / $0]
Unsuccessful respondents (2)
Division 3
Kroeschell Engineering Co., Inc.Arlington Heights, IL
- Amount: $974,124
- Terms: One-time transaction
- C & G Construction Supply Co., Inc. (subcontractor)BEP [25.16% / $0]
- Sullwood Inc. (subcontractor)VBP [3.29% / $0]
- Integrated Demolition Service LLC (subcontractor)BEP [4% / $0]
- Aaron Engineering Services (subcontractor)BEP [1.37% / $0]
- Royal Crane Service, Inc. (subcontractor)BEP [0.85% / $0]
Unsuccessful respondents (4)
Division 5
Althoff Industries, Inc.Crystal Lake, IL
- Amount: $265,905
- Terms: One-time transaction
- Pure Electric Inc. (subcontractor)BEP [30% / $0]
- Wolf Electric Supply Company, Inc. (subcontractor)VBP [3% / $0]
Unsuccessful respondents (2)
Summary
Respondents
3 successful respondents
8 unsuccessful respondents
Buyer for this procurement: Karen Brown, (217) 330-2901
Chief procurement officer for this procurement: Bridget McHatton
State purchasing officer for this procurement: Caleb Adams
The University award process may be delayed as this award goes through a state approval process.
The Library of the Health Sciences (942) and Human Resources Building (907) are served using individual chilled water system(s) and/or zone-based direct-expansion systems for comfort cooling and humidity control. Buyer has experienced multiple failures of the cooling system equipment and has determined that this equipment has reached the end of its anticipated useful life. This Project will replace both 250-ton water-cooled chillers in the Mechanical Room in Building 942 basement with two (2) new 200-ton air-cooled variable-speed chillers on the Building 942 roof. This entails demolishing the existing chillers, cooling towers, chilled and condenser water pumps, and piping as necessary. The Project will also modify the existing chilled water piping, electrical raceways, and controls to connect the new chillers. This Contract consists of renovating the existing chilled water and condenser water systems to install new chillers, pumps, valves, and instrumentation.
This Project is located at: 1750 W Polk St, Chicago- Building 942, Library of Health Sciences.
A MANDATORY pre-bid conference for all parties interested in bidding the project will be held in 1750 W Polk St, Room 123, Chicago at 10:00 AM on 11/15/2023.Representatives of the Owner and the Professional Services Consultant will be present to answer questions regarding the project and bidding procedures. All prospective bidders are REQUIRED to attend.
See attached for complete details.
At the following addressvia PRZM electronic bidding per bidding documents
Chicago, IL 60612
Chicago, IL 60612
Phone: (312) 996-3799
E-Mail:sandeepk@uic.edu
At the following addressvia PRZM electronic bidding per bidding documents
Chicago, IL 60612
Chicago, IL 60612
Phone: (312) 996-3799
E-Mail:sandeepk@uic.edu
For instructions on how to obtain a comprehensive purchase description, disclosure or contract forms, contact:
- There is a 30 percent BEP goal for this procurement. See solicitation documentation for details.
- There is a 3 percent Veteran-owned business goal for this procurement. See solicitation documentation for details.
- The contract(s) for this solicitation could exceed $50,000 annually.
This transaction is subject to the State Board of Elections registration and certification requirements of Public Act 095-0971.
The State of Illinois has a policy to encourage prospective vendors to hire qualified veterans, minorities, females, persons with disabilities and ex-offenders.